I checked all the factors in my categories and, I realised that the budgeting category was in the wrong place as the budget is probably the most significant factor of pre-production; everything is limited because of it. Therefore, I moved the budget to the second task to complete after finalising a script. After checking all my ideas, I estimated how long each section of my pre-production would take, and came together with the timing plan above. I came to the conclusion that the whole process would take eleven weeks. I did this in this format because previously, with the sticky notes, it was so that I could keep changing my ideas until I was happy with it. So, this plan was to make everything permanent and allow me to take timing into consideration.